step generator

英 [step ˈdʒenəreɪtə(r)] 美 [step ˈdʒenəreɪtər]

网络  基极阶梯信号; 阶梯信号产生器; 产生器

电力



双语例句

  1. We will take our word-game scripts one step further working with a difficult logic by building a complex anagram generator, a crypto solver, and more.
    我们将通过构建一个复杂的变位词生成器、解码器等,进一步处理文字游戏脚本的复杂逻辑。
  2. The step adjustment of the generator output frequency and amplitude is controlled by a single chip microcomputer in order to realize the digital display.
    文章就采用中大规模集成电路设计一个新型的多波形发生器,并由单片机系统控制其输出频率和幅度的步进调节,实现数码显示等展开了讨。
  3. The final step is to complete the generator by adding information to the remaining fields in the table
    最后一步是在表中其余字段中添加信息,完成生成器
  4. Introducing the application scope of the exciting machine and giving the first step research about the application of airborne AC exciting generator.
    介绍了交流励磁电机的应用范围,对交流励磁发电机在航空电源上的应用进行了初步探讨,给出了明确定义及理论基础。
  5. A new ultra wideband ( UWB), low-complexity and step recovery diode Gaussian pulse generator is introduced.
    提出了一种新型的用于超宽带系统的高斯脉冲发生器。
  6. Step recovery effect harmonic generator
    阶跃恢复效应谐波发生器
  7. The results of simulation show that the scheme can not only solve effectively the deviation problem of terminal voltage caused by the step disturbance of the prime mover, but also, it can improve both power angle stability and dynamic characteristic of the generator terminal voltage.
    仿真结果表明:这种设计方法不仅能够有效解决由于原动机阶跃输入扰动带来的发电机机端电压偏差问题,而且改善了功角稳定性和发电机机端电压的动态特性。
  8. A step signal generator with single chip microcomputer
    单片机控制阶梯波信号发生器
  9. Circuit Analysis of Step-wave Voltage Generator
    阶梯波电压发生器电路分析
  10. In this paper, a unified computation framework of discrete and continuous wavelet transform based on lifting scheme and a reconfigurable architecture that includes reconfigurable lifting step arrays and reconfigurable address generator are proposed.
    提出了一种基于提升算法的连续和离散统一的小波变换算法,给出可重构的计算结构,包括可重构的提升节点阵列和地址发生器。
  11. Different waveform signals such as ramp function, step function, pulse function and exponential function are available by changing the parameters of the signal generator.
    通过改变信号发生器的参数,可方便得到斜坡、阶跃、脉冲和e函数等各种不同波形的信号。
  12. It is the key step of developing electric analysis software to carry on mathematics modeling to power system, the mathematics model of power system includes electric network model, generator model, load model and various kinds of automatics model, etc.
    对电力系统进行数学建模是开发电力系统分析软件的关键步骤,电力系统数学模型包括电力网络模型、发电机模型、负荷模型和各种自动装置模型等。
  13. The calculation of winding's inductance is an important step for the transient process simulation of a generator with stator winding faults.
    故障发电机绕组电感系数的计算是分析故障发电机瞬变过程的重要一环。
  14. A high-speed sampling system for echo signal of impulse GPR based on equivalent time sampling method is presented, and significant circuits including step sampling pulse generator and sampling gate circuit are designed.
    提出了一种基于等效时间采样方法的冲击型探地雷达回波信号高速采样系统,设计实现了等效时间采样的关键电路,包括步进采样脉冲发生器、采样门电路。
  15. Study on microprocessor-based out of step protection for large generator units
    大型发电机微机失步保护的研究
  16. Design of Step Motor Pulse Generator Based on CPLD
    CPLD器件在步进电机脉冲发生器中的应用
  17. Improved out-of-step protection for synchronous generator based on the three-impedance element principle
    同步发电机三阻抗元件失步保护原理的改进
  18. According to the principle of transistor curve measurement, this article describes Pumping circuit and studies a new step signal generator with single Chip microcomputer in application to power transistor module characteristic measurement.
    本文从晶体管特性测试原理出发.叙述了传统的泵式阶梯波信号产生电路.探讨了应用于电力晶体管特性测试系统中的单片机控制阶梯波信号发生器。
  19. It is the important step to ensure the steadily and safely running of the turbine generator set by calculating and adjusting the bearings load.
    精确地计算、调整汽轮发电机组轴系的轴承标高,是保证机组稳定、安全运行的重要措施。
  20. A voltage-switch model for step recovery diode ( SRD) and its SPICE simulation parameters are presented. The SRD-model-based design of the pulse generator for Ultra-WideBand ( UWB) fuze is explicitly discussed and its performance is predicted by PSPICE simulation.
    给出了阶跃恢复二极管(SRD)的电压跃变模型以及SPICE仿真参数,分析讨论了基于SRD仿真模型的超宽带引信脉冲源的设计,并利用PSPICE仿真软件对设计的电路进行了仿真。
  21. To solve the great energy comsumption, especially at the down step when the energy reverse flow because of the stake of pumping drop itself, so the motor on the state of generator running.
    如何解决抽油机能耗大,效率低的问题,特别是在下冲程时,抽油杆柱依靠自重下落,能量出现倒流,电动机处于发电机运行状态等等,是抽油机研究与解决的主要问题。
  22. In this paper a torsional vibration model of step shaft elastically distributed structure is established for turbo generator rotor shaft system.
    建立了汽轮发电机组转子轴系的阶梯轴弹性连续体扭振模型。
  23. In the developing process of MDA, the first step is to build up the platform independent model, and then transform it into the platform specific model for concrete middle platform, finally generate application program code and test framework from the platform model by a code generator.
    在MDA方式的开发过程中,首先建立与平台无关的业务模型,然后转换成特定中间件的平台相关模型,最后由代码生成工具将平台相关模型生成应用程序代码和测试框架。
  24. Analysis of Open Phase Step-Out for Generator Unit
    发电机组非全相解列分析
  25. Teaching is a crucial step in the process of insulating generator stator ′ s bars with insulating tape.
    示教是为定子线圈包扎绝缘带过程中关键的环节。
  26. The target guiding method during step large disturbance process for synchronous generator
    控制同步发电机阶跃大扰动过程的目标引导法
  27. Loss of excitation and out of step are the common failure form of generator, which makes loss-of-excitation and out-of-step protection the most significant aspect of large generator protection related with grid.
    发电机的失磁和失步是常见的故障,使得失磁与失步保护成为研究大型发电机组的涉网保护的重中之重。
  28. Step delay pulse generator, and the data are stored in memory is converted by A/ D converter are controled by CPLD.
    CPLD主要控制步进延时脉冲信号发生器产生步进延时脉冲以及对控制存储器对A/D转换后的数据进行存储。
  29. In the feasibility design step, the main research include the wind source analyzing in wind farm, wind farm layout optimizing, wind turbine generator choosing.
    可行性研究阶段主要研究的内容为根据测风塔数据对风电场风资源情况进行详细的分析、风机布置方案比选及优化、风机选型。